Fig. 3.4. Workers at Envirocare of Utah, Inc., prepare to pour clean concrete in the void spaces between drums and to seal the drums in the lined disposal cell.

Once the drums have been sealed in the lined disposal cell with clean concrete, the area is capped with clean soil.

Load this image in Acrobat